Finish My Bath · Raleigh-Durham Triangle
Left half done? We finish the job.
Two ways we finish a bathroom: we complete a job another contractor left unfinished — we look first and price it in writing — or we finish the rest of your bathroom after your new shower, one published item at a time.
Illustrative- $229Lowest published price · one grab bar, installed
- QuoteUnfinished jobs: written price after a visit
- OursOur warranty covers the work we do
- 40/30/30Payments tied to milestones
Unfinished jobs
Layer · Waterproofing membraneSomeone left your bathroom half done?
It happens: a contractor disappears, a project runs out of time, or the work isn’t right. Here is how we take it from where it is.
- Free · No obligation
We look first
We visit, see what was done and how, and photograph what is already there before we touch anything.
- Written · Price locked
One price, in writing
You get an exact written price for finishing the job. It changes only through a change order you approve in writing.
- Clear line
Ours vs. theirs
Your quote says exactly which work is ours. We answer for the work we do; work someone else did isn’t covered by our warranty.
- Photographed
We finish it
Our work is photographed as it moves forward and the photos are delivered to you, and the last 30% is due only after your final approval.
À la carte · Published prices
Surface · TerrazzoFinish the rest of your bathroom.
$229–$7,900, installed. Electrical and plumbing work, when required, will be performed by North Carolina–licensed contractors.
- Installed and verified — not product-only pricing.
Safety Upgrade Packages
1 Bar Installed
- Placement guidance
- Structure verification
- Standard tile drilling
- Clean install
- Workmanship warranty
Starting at $229Book this item →2 Bars Installed
- Placement guidance
- Structure verification
- Standard tile drilling
- Clean install
- Workmanship warranty
Starting at $399Book this item →3 Bars Installed
- Placement guidance
- Structure verification
- Standard tile drilling
- Clean install
- Workmanship warranty
Starting at $589Book this item →
- The fastest way to make the entire bathroom feel new.
Floor Refresh
Floor Refresh
The fastest way to make the entire bathroom feel new.
- Up to 50 sqft
- Waterproof LVP Tier 1 or Ceramic Tier 1
- Transition trim
- Minor subfloor check
- Priced separately if found: Subfloor damage requiring repair · Heavy tile demolition needed · Floor leveling required
Starting at $2,190Book this item →
- Modernize the focal point of your bathroom.
Vanity & Mirror Upgrade
Vanity & Mirror Upgrade
Modernize the focal point of your bathroom.
- 36" or 48" Vanity (Tier system)
- Mirror or LED Mirror Tier 1
- Faucet swap
- Clean reconnection
Published range $2,800–$4,900Book this item →
- For homeowners who want it to feel done.
Complete Bathroom Finish
Best Overall Value
Complete Bathroom Finish
For homeowners who want it to feel done.
- Floor Refresh
- Vanity & Mirror
- Hardware refresh
- Optional safety add
Published range $4,900–$7,900Book this item →
What you get · Check it yourself
Surface · TerrazzoWhat you get — and where to check it.
Each one is something you can check — on this site before you book, or on the paperwork you sign.
The Showerly system
A process you can check — not a promise you have to trust.
- Measured in your home, priced in writingYour quote is built from your bathroom’s real measurements and locked in writing before anything is ordered.
- Photos of your projectYour Proof Pack: photos of your project — the waterproofing always before it’s covered — saved to your private project page.
- One private portalQuote, signature, payments, photos and warranty, all in one place.
- 25+ years of construction experienceThe way we measure, schedule and finish comes from more than 25 years in construction and operations.
- 01
Price published first
Finish My Bath upgrades start at $229, published before anyone visits your home.
Check it: See all prices - 02
Price Lock, in writing
Your scope and price are written and signed before work starts. The number changes only through a change order you approve in writing.
Check it: In the quote you sign
- 03
Payments follow the work
40% when you sign, 30% the day demolition starts (or the day work starts, on jobs with no demolition), and 30% after your final approval.
Check it: Printed in your contract
- 04
1-year labor warranty
Showerly warrants its installation workmanship for 1 year. Manufacturer warranties on materials pass through to you on their own terms.
Check it: Read the warranty terms - 05
No sales reps
The person who measures your bathroom writes your quote — built from your real measurements, locked in writing, with no pressure to sign.
Check it: Step 01 of How it works - 06
Licensed plumbing & electrical
Plumbing and electrical work is performed by NC-licensed plumbing and electrical contractors (N.C.G.S. 87-21, 87-43.1), coordinated by Showerly.
Check it: Named in your written scope
- 07
Proof Pack photos
Your project is photographed as the work moves forward — always including the waterproofing before it’s covered — and the photos are delivered to you.
Check it: Delivered with your project file
- 08
English & Spanish
Your visit, your written quote and your project updates in English or Spanish. Se habla español.
Common questions
Wall · Linen-look porcelainAsked. Answered.
It's how we finish what's left. Either a bathroom another contractor left unfinished or didn't do right — we look first and give you the exact price in writing — or the rest of the bathroom after your new shower: floors, vanity, accessories and grab bars, with a published range of $229–$7,900.
No. We answer for the work we do. Work someone else did isn’t covered by our warranty. Before we start, we document what is already there with photos and write down exactly which work is ours, so the line is clear.
Because every half-finished bathroom is different: what was done, how it was done and what is missing. We visit, look at it and give you one written price before anything starts. The finishing pieces below do have published prices.
Work stops, it is photographed, and you get a written change order with the exact price. Nothing continues until you approve it in writing.
Plumbing and electrical work is performed by NC-licensed plumbing and electrical contractors (N.C.G.S. 87-21, 87-43.1), coordinated by Showerly.
Showerly serves 12 towns in the Triangle: Raleigh, Durham, Cary, Chapel Hill, Morrisville, Apex, Holly Springs, Wake Forest, Garner, Fuquay-Varina, Knightdale and Clayton. Free in-home visits are available throughout this service area at no charge.
All Showerly services
Surface · Porcelain 24×24Every price, published.
Finish My Bath is one of six services. Every range is published before anyone visits.
Mix & match
Published ranges- This pageFinish My Bath$229–$7,900
- Smart Start$3,500–$5,500
- Crafted Tile Shower$7,800–$12,000+
- Tub to Walk-In$7,499–$12,500
- Glass OptionsCustom quote
- Smart Bath$790–$4,990
All prices confirmed and locked in writing at your free in-home visit.
Free · No obligation
Let’s finish your bathroom.
We visit, look at what’s there and give you a written price — whether it’s one grab bar or a job someone else left half done.
RALEIGH · DURHAM · CARY · CHAPEL HILL · MORRISVILLE · APEX · HOLLY SPRINGS · WAKE FOREST · GARNER · FUQUAY-VARINA · KNIGHTDALE · CLAYTON

